Client: AO “ILIM Group”
Work period: July, 2019 — January, 2022
Project: Technical refurbishment of existing bark boilers Nos. 4 and 5 KM 75-40 with the conversion of burning bark and wood wastes to the fluidized bed technology with a new dust removal system