Client: OOO RK “Energostroy”
Work period: March 2019 — April 2019
Project: Development of a feasibility study for the production of the main power-generating equipment for power units with the installed power capacity 200–230 and 300–350 MW at the sites of the Astrakhan and Kaluga regions