ru | eng

Projects

Client: OOO RK “Energostroy”

Work period: March 2019 — April 2019

Project: Development of a feasibility study for the production of the main power-generating equipment for power units with the installed power capacity 200–230 and 300–350 MW at the sites of the Astrakhan and Kaluga regions






×






×





×
×






×






×

Задайте вопрос!


×






×






×

Задайте вопрос!


×






×






×






×






×






×






×






×






×






×






×






×






×






×






×






×




×




×