ru | eng

News

COTES Will Refurbish a Hazardous Industrial Facility of Cherepovetsk GRES

  • 22.09.2020

COTES has won a competition and will perform a technical refurbishment of a part of the process diagram for power unit No. 3 in the main building of the Cherepovetsk GRES.

Its aim is to improve the heat content of the thermal unit in the main building in the boiler mode to fulfil the needs of the Cherepovetsk GRES.

The SoW of COTES Engineering includes the development of detailed design, industrial safety expert review, supply of equipment and materials, construction and installation, and startup works as well as industrial commissioning of the facility. The works should be completed within 3 months.

Recent news

COTES Engineering has successfully completed ISO 9001:2015 Quality Management System audit

COTES has completed equipping the Novosibirskaya CHPP-5 with the cleaning system for boiler equipment heating surfaces

We send our congratulations on Power Engineer’s Day and coming New Year!

COTES has visited Enlit Europe, the largest European exhibition for power energy development

COTES has been listed among 250 selected projects at GreenTech Startup Booster in Skolkovo

COTES has told about black oil free burning at the “Combustion” Conference in Akademgorodok

COTES will install an emission control system at the Bratskaya CHPP-6

Congratulations with the Designer’s Day!

COTES Will Equip 3 Flue Stacks at RUSAL With Continuous Emission Monitoring Systems

COTES at PAP-FOR 2021: Aleksei Kolegov Has Told About Implementing Environmental Emission Monitoring Systems

TPP “Nikola Tesla A” Has Approved Conceptual Solutions (IDR) for the Refurbishment of A2 Boiler Developed by COTES Engineering

COTES Engineering Continues the Work for the Development of Construction, Design, Detailed Design and Estimate Documents for the Refurbishment of CHPP of the Affiliate Branch of AO “RIR” in Seversk

COTES Brand’s 29th Anniversary

COTES Engineering Takes Part in the Technical Refurbishment of the Nizhegorodskaya GRES of AO Volga

Congratulations to Machine Building Plant Workers On Their Professional Holiday!

COTES Engineering at WasteTech 2021

Working Visit of COTES Delegation to the Tyazhmash Plant

SRB-5 Refurbishment Work Has Been Completed in Koryazhma

Refurbishment of the Gas Incineration System of SRB-14 in the Affiliate Branch of Ilim Group has been completed

COTES Congratulates Colleagues on the Constructor’s Day!






×






×





×
×






×






×

Задайте вопрос!


×






×






×

Задайте вопрос!


×






×






×






×






×






×






×






×






×






×






×






×






×






×






×






×




×




×