ru | eng

News

COTES Engineering and Taganrog Boiler Plant discussed joint projects

  • 21.08.2020

In early August, a delegation from COTES Engineering visited the Taganrog Boiler Plant (TKZ) at the invitation of Power Machines PJSC. Top managers of these companies discussed issues of their interaction. The issues concerned the development of design and construction documentation at the facilities where the companies are already operating today, as well as within the framework of projects implemented by the plant under the DPM-2 program.

Particular attention was paid to environmental and efficiency issues, including the organization of oil-free ignition of pulverized coal boilers, the introduction of systems for reducing polluting emissions and monitoring the flue gas composition. The participants also discussed issues of organizing a full cycle of work related to boiler equipment, including express inspections of boilers and auxiliary equipment, as well as commissioning and adjustment work.

Both parties were satisfied with the results of the meeting. A positive synergistic effect is expected from the combination of unique knowledge about equipment, technological and production capabilities of TKZ, and COTES Engineering integrated approach. At the close of the meeting, a protocol on cooperation was signed, which reflected the main aspects of promising cooperation.

Recent news

COTES Engineering has successfully completed ISO 9001:2015 Quality Management System audit

COTES has completed equipping the Novosibirskaya CHPP-5 with the cleaning system for boiler equipment heating surfaces

We send our congratulations on Power Engineer’s Day and coming New Year!

COTES has visited Enlit Europe, the largest European exhibition for power energy development

COTES has been listed among 250 selected projects at GreenTech Startup Booster in Skolkovo

COTES has told about black oil free burning at the “Combustion” Conference in Akademgorodok

COTES will install an emission control system at the Bratskaya CHPP-6

Congratulations with the Designer’s Day!

COTES Will Equip 3 Flue Stacks at RUSAL With Continuous Emission Monitoring Systems

COTES at PAP-FOR 2021: Aleksei Kolegov Has Told About Implementing Environmental Emission Monitoring Systems

TPP “Nikola Tesla A” Has Approved Conceptual Solutions (IDR) for the Refurbishment of A2 Boiler Developed by COTES Engineering

COTES Engineering Continues the Work for the Development of Construction, Design, Detailed Design and Estimate Documents for the Refurbishment of CHPP of the Affiliate Branch of AO “RIR” in Seversk

COTES Brand’s 29th Anniversary

COTES Engineering Takes Part in the Technical Refurbishment of the Nizhegorodskaya GRES of AO Volga

Congratulations to Machine Building Plant Workers On Their Professional Holiday!

COTES Engineering at WasteTech 2021

Working Visit of COTES Delegation to the Tyazhmash Plant

SRB-5 Refurbishment Work Has Been Completed in Koryazhma

Refurbishment of the Gas Incineration System of SRB-14 in the Affiliate Branch of Ilim Group has been completed

COTES Congratulates Colleagues on the Constructor’s Day!






×






×





×
×






×






×

Задайте вопрос!


×






×






×

Задайте вопрос!


×






×






×






×






×






×






×






×






×






×






×






×






×






×






×






×




×




×