ru | eng

News

Winning tender bid: COTES is going to create a design and generate working documents for the recovery boiler, stage No. 5, in Koryazhma

  • 23.07.2019

COTES Engineering has become a winner in the tender “Refurbishment of the recovery boiler No. 5 (RB-5), for the Ilim Group Branch in Koryazhma”. The COTES specialists will develop the design and working documents, provide support for the industrial safety expert review and field supervision at the facility during its construction and assembly

In February 2019, COTES Engineering received a letter of appreciation for the successful implementation of survey works at this facility from the Investment Directorate of the Ilim Group. COTES performed an engineering survey at the construction site, examination of the engineering structures of the TPP-2 building, development of the FEL-3 application and detailed design for construction, and developed the design solutions for the recovery boiler No. 5, refurbishment.

The possibility to provide a full range of services for retrofitting and refurbishment of the recovery boilers is a key COTES competence. The company’s specialists perform basic engineering and design of auxiliary boiler systems (burners, pipelines, soot blowers) providing the integrated field supervision services. The COTES Engineering employees have all the required competences and permits to perform works at the wood and paper plants, regularly upgrade their qualifications and receive specialized trainings.

Recent news

COTES Engineering has successfully completed ISO 9001:2015 Quality Management System audit

COTES has completed equipping the Novosibirskaya CHPP-5 with the cleaning system for boiler equipment heating surfaces

We send our congratulations on Power Engineer’s Day and coming New Year!

COTES has visited Enlit Europe, the largest European exhibition for power energy development

COTES has been listed among 250 selected projects at GreenTech Startup Booster in Skolkovo

COTES has told about black oil free burning at the “Combustion” Conference in Akademgorodok

COTES will install an emission control system at the Bratskaya CHPP-6

Congratulations with the Designer’s Day!

COTES Will Equip 3 Flue Stacks at RUSAL With Continuous Emission Monitoring Systems

COTES at PAP-FOR 2021: Aleksei Kolegov Has Told About Implementing Environmental Emission Monitoring Systems

TPP “Nikola Tesla A” Has Approved Conceptual Solutions (IDR) for the Refurbishment of A2 Boiler Developed by COTES Engineering

COTES Engineering Continues the Work for the Development of Construction, Design, Detailed Design and Estimate Documents for the Refurbishment of CHPP of the Affiliate Branch of AO “RIR” in Seversk

COTES Brand’s 29th Anniversary

COTES Engineering Takes Part in the Technical Refurbishment of the Nizhegorodskaya GRES of AO Volga

Congratulations to Machine Building Plant Workers On Their Professional Holiday!

COTES Engineering at WasteTech 2021

Working Visit of COTES Delegation to the Tyazhmash Plant

SRB-5 Refurbishment Work Has Been Completed in Koryazhma

Refurbishment of the Gas Incineration System of SRB-14 in the Affiliate Branch of Ilim Group has been completed

COTES Congratulates Colleagues on the Constructor’s Day!






×






×





×
×






×






×

Задайте вопрос!


×






×






×

Задайте вопрос!


×






×






×






×






×






×






×






×






×






×






×






×






×






×






×






×




×




×