Client: AO "ILIM Group"
Work period: December, 2019 — August, 2022
Project: Development of Detailed Design for the "Construction of the inter-shop communications" under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project"
Client: AO "ILIM Group"
Work period: July, 2019 — January, 2022
Project: Technical refurbishment of existing bark boilers Nos. 4 and 5 KM 75-40 with the conversion of burning bark and wood wastes to the fluidized bed technology with a new dust removal system
Client: AO "ILIM Group"
Work period: November, 2019 — December, 2021
Project: Construction of RB-4 under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project
Client: AO "ILIM Group"
Work period: June, 2019 — December, 2020
Project: Technical refurbishment of recovery boiler No. 5 (RB-5) for the Koryazhma branch of AO "Ilim Group"
Client: ZAO "PIRS"
Work period: October, 2019 — September, 2020
Project: Construction of a steam-ejector plant for the needs of Omsk Oil Refinery
Client: PAO "Irkutskenergo"
Work period: April, 2020 – August, 2020
Project: Engineering surveys, development of design and detailed design documentation on re-equipment of the flue stack No.1 of Novo-Irkutskaya CHP plant with installation of the continuous automatic pollutants emission monitoring and pollutants volume and/or weight and concentration accounting systems (CAPEMA)"
Client: AO "ILIM Group"
Work period: November, 2019 — June, 2020
Project: Development of detailed design under the "System for collection and disposal of DNCG gases from evaporator plants Nos. 6, 7 and 8, burning in RB-11, retrofitting" investment project
Client: OOO "TOR"
Work period: June 2019 — July 2019
Project: Development of metal structure drawings for the Ilim Group Branch in Ust-Ilimsk
Client: AO "Ilim Group"
Work period: April 2019 — June 2019
Project: Development of documents for FEL3, working and design documents for the recovery boiler (RB-3000) of TPP-3 at the Bratsk Pulp and Paper Mill
Client: OOO "Service Metal Center Steelline"
Work period: May 2019 — June 2019
Project: Development of detailed design for the refurbishment of PAO "Tyazhstankogidropress"
Client: AO "Ilim Group"
Work period: November 2018 — June 2019
Project: Development of FEL-2 documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma
Client: AO "Ilim Group"
Work period: October 2017 – December 2018
Project: Development of the design and detailed documentation for the re-equipping of recovery boiler RB-1400 No.3 of at the Ust-Ilimsk forest complex
Client: OOO "RK Energostroy"
Work period: September 2018 — December 2018
Project: Scientific and research work on the development of technology and equipment for black oil-free ignition of boiler No.10 at the Troitskaya GRES PAO "OGK-2
Client: AO "Ilim Group"
Work period: September 2018 — December 2018
Project: Development of a FEL-3 investment request and design documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma
Client: AO "Razrez-Izykhskiy"
Work period: September 2018 — October 2018
Project: DKVR and KE boilers performance-and-commissioning tests using coal at the AO "Razrez Izykhskiy" boiler house
Client: PAO "Tyazhstankogidropress"
Work period: June 2017 — January 2018
Project: Development of the basic design and detailed design documentation for the re-equipping of the 20 MW gas boiler house at Tyazhstankogidropress. Equipment supply, installation and commissioning.