Client: AO "Rusatom Infrastructure Solutions" (former AO "OTEK")

Work period: June, 2020 — January, 2022

Project: Refurbishment of CHP plant in the Seversk branch of AO "OTEK"


more

Client: AO "TGK-11"

Work period: April 2019 — December 2019

Project: Examination of the support and suspension system and verification of calculations for the steampipes at Omskaya СHP-3


more

Client: PAO "OGK-2"

Work period: August 2018 — June 2019

Project: Development of technology and equipment for black oil-free ignition of BKZ-420-140 at Krasnoyarskaya GRES-2


more

Client:AO "OTEK"

Work period: January 2019 — May 2019

Project: Elaboration of an engineering solution and development of financial feasibility study for the construction of CHP Plant of AO "OTEK’s" Seversk Branch


View feedback
more

Client: Sky Topeco D.O.O. Beograd

Work period: February 2019 — April 2019

Project: Heat tests for the boiler at the Ugljevik TPP (Bosnia and Herzegovina, Republika Srpska)


more

Client: OOO RK "Energostroy"

Work period: March 2019 — April 2019

Project: Development of a feasibility study for the production of the main power-generating equipment for power units with the installed power capacity 200–230 and 300–350 MW at the sites of the Astrakhan and Kaluga regions


more

Client: PAO TGK-14 (Chitinskaya Generatsiya)

Work period: November 2018 — January 2019

Project: Examination of the hydraulic ash-transport system at Chitinskaya CHP-1


View feedback
more

Client: OOO "QUARTZ Group

Work period: September 2018 — December 2018

Project: Creating the basic design and detailed design documentation for blowers’ installation at the pulverized coal 200 MW power unit No.6 of Novosibirskaya CHP-5


View feedback
more

Client: PAO TGK-14

Work period: September — November 2018

Project: Development of a design-estimate and detailed design documentation for the re-equipping of Ulan-Ude CHP-2


View feedback
more

Client: PAO Irkutskenergo

Work period: September 2018 — November 2018

Project: Design and survey works for the "Re-equipping of the Irkutskaya CHP-10’s boiler plants through the implementation of pulverized coal electroionization ignition technology" project


more

Client: OOO "EnergoEngineeringGroup"

Work period: January 2018 — November 2018

Project: Upgrade of the deaeration and make-up plant at CHP-3 in the city of Omsk


View feedback
more

Client: PAO "MosEnergo"

Work period: August 2018 — October 2018

Project: Retrofit of power unit No. 9 at CHP-22 Mosenergo


View feedback
more

Client: OOO Vorkutinskiye CHP Plants

Work period: March 2018

Project: Trial burning of furnace black oil 100, STO 05747181-034-2017 at Central water heating boiler house of the city of Vorkuta


View feedback
more

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: January 2018 — February 2018

Project: Performance-and-commissioning boilers BKZ-75-39 tests in the Linyovo heat supply boiler house, Novosibirsk Region


View feedback
more

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: August 2017 — December 2017

Project: Development of design alternatives for the flue draft fans and district heating pump control system at the Linyovo heat supply boiler house, Novosibirsk Region


more

Client: PAO "TGK-14" Chitinskaya Generatsiya"

Work period: October 2017 – December 2017

Project: Development of a feasibility study for cycle arrangement optimization at the Chitinskaya CHP-1