Client: AO "Blagoveshchenskaya CHP plant"
Work period: June, 2019 — December, 2019
Project: Stage No.5 boiler unit's emissions monitoring system re-equipment, AO "Blagoveshchenskaya CHP plant"
Client: PAO "Irkutskenergo"
Work period: May 2019 — August 2019
Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Bratskaya CHP-6 and Angarskaya CHP-10
View feedback on Angarskaya CHP-10 View feedback on Bratskaya CHP-6 Read moreClient: PAO Irkutskenergo
Work period: March 2018 — August 2018
Project: Feasibility study for the installation of automatic systems for continuous monitoring of pollutant emission volume and/or mass and concentration and accounting (APECM&AS) at seven Irkutskenergo plants
Client: AO "Ilim Group"
Work period: August of 2017 — March of 2018
Project: Development of detailed design documentation for equipping the emission sources with automatic information systems (AIS) for continuous monitoring and accounting of pollutant industrial emissions mass at the Ust-Ilimsk Pulp and Paper Mill
Client: OAO Ilim Group
Work period: October 2016 — April 2017
Project: Development of detailed design documentation for the boilers’ water chemistry automation, evaluation of the project’s payback