ru | eng

References

2021 2020 2019 2018 2017 2016

2021

Client: AO "ILIM Group"

Work period: December, 2019 — August, 2022

Project: Development of Detailed Design for the "Construction of the inter-shop communications" under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project"


Read more

Client: AO "Rusatom Infrastructure Solutions" (former AO "OTEK")

Work period: June, 2020 — January, 2022

Project: Refurbishment of CHP plant in the Seversk branch of AO "OTEK"


Read more

Client: AO "ILIM Group"

Work period: July, 2019 — January, 2022

Project: Technical refurbishment of existing bark boilers Nos. 4 and 5 KM 75-40 with the conversion of burning bark and wood wastes to the fluidized bed technology with a new dust removal system


Read more

Client: AO "ILIM Group"

Work period: November, 2019 — December, 2021

Project: Construction of RB-4 under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project


Read more

2020

Client: AO "ILIM Group"

Work period: June, 2019 — December, 2020

Project: Technical refurbishment of recovery boiler No. 5 (RB-5) for the Koryazhma branch of AO "Ilim Group"


Read more

Client: ZAO "PIRS"

Work period: October, 2019 — September, 2020

Project: Construction of a steam-ejector plant for the needs of Omsk Oil Refinery


Read more

Client: PAO "Irkutskenergo"

Work period: April, 2020 – August, 2020

Project: Engineering surveys, development of design and detailed design documentation on re-equipment of the flue stack No.1 of Novo-Irkutskaya CHP plant with installation of the continuous automatic pollutants emission monitoring and pollutants volume and/or weight and concentration accounting systems (CAPEMA)"


Read more

Client: AO "ILIM Group"

Work period: November, 2019 — June, 2020

Project: Development of detailed design under the "System for collection and disposal of DNCG gases from evaporator plants Nos. 6, 7 and 8, burning in RB-11, retrofitting" investment project


Read more

Client: AO "Valmet Automation"

Work period: September 2019 — April 2020

Project: Commissioning of the biofuel boiler Hybex ® at AO "Mondi SLPK"


View feedback
Read more

2019

Client: AO "Blagoveshchenskaya CHP plant"

Work period: June, 2019 — December, 2019

Project: Stage No.5 boiler unit's emissions monitoring system re-equipment, AO "Blagoveshchenskaya CHP plant"


View feedback
Read more

Client: AO "TGK-11"

Work period: April 2019 — December 2019

Project: Examination of the support and suspension system and verification of calculations for the steampipes at Omskaya СHP-3


Read more

Client: AO "ILIM Group"

Work period: August, 2019 — October, 2019

Project: Replacement of wooden sleepers along the edge of the black oil discharge


View feedback
Read more

Client: PAO "Irkutskenergo"

Work period: May 2019 — August 2019

Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Bratskaya CHP-6 and Angarskaya CHP-10


View feedback on Angarskaya CHP-10
View feedback on Bratskaya CHP-6
Read more

Client: OOO "TOR"

Work period: June 2019 — July 2019

Project: Development of metal structure drawings for the Ilim Group Branch in Ust-Ilimsk


Read more

Client: PAO "OGK-2"

Work period: August 2018 — June 2019

Project: Development of technology and equipment for black oil-free ignition of BKZ-420-140 at Krasnoyarskaya GRES-2


Read more

Client: PREMAR SERVICES A.G.

Work period: May 2019 — June 2019

Project: Examination of energy facilities of AO "Galenika" (Serbia) with the development of recommendations for its refurbishment


Read more

Client: AO "Ilim Group"

Work period: April 2019 — June 2019

Project: Development of documents for FEL3, working and design documents for the recovery boiler (RB-3000) of TPP-3 at the Bratsk Pulp and Paper Mill


Read more

Client: OOO "Service Metal Center Steelline"

Work period: May 2019 — June 2019

Project: Development of detailed design for the refurbishment of PAO "Tyazhstankogidropress"


Read more

Client: AO "Ilim Group"

Work period: November 2018 — June 2019

Project: Development of FEL-2 documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma


View feedback
Read more

Client:AO "OTEK"

Work period: January 2019 — May 2019

Project: Elaboration of an engineering solution and development of financial feasibility study for the construction of CHP Plant of AO "OTEK’s" Seversk Branch


View feedback
Read more

Client: Sky Topeco D.O.O. Beograd

Work period: February 2019 — April 2019

Project: Heat tests for the boiler at the Ugljevik TPP (Bosnia and Herzegovina, Republika Srpska)


Read more

Client: OOO RK "Energostroy"

Work period: March 2019 — April 2019

Project: Development of a feasibility study for the production of the main power-generating equipment for power units with the installed power capacity 200–230 and 300–350 MW at the sites of the Astrakhan and Kaluga regions


Read more

Client: OOO "Mechel-Energo"

Work period: February 2019 — April 2019

Project: Development of a feasibility study for the retrofitting of the chemical water treatment system in the CHP Plant of a Moscow Coke and Gas Plant


Read more

Client: OOO "Siberian Heat and Power Company" (SibTEK

Work period: November 2018 — January 2019

Project:Design and survey works, and installation of a semi-automatic boiler ignition system in the Linyovo heat supply boiler house, Novosibirsk Region


Read more

Client: PAO TGK-14 (Chitinskaya Generatsiya)

Work period: November 2018 — January 2019

Project: Examination of the hydraulic ash-transport system at Chitinskaya CHP-1


View feedback
Read more

2018

Client: AO "Ilim Group"

Work period: October 2017 – December 2018

Project: Development of the design and detailed documentation for the re-equipping of recovery boiler RB-1400 No.3 of at the Ust-Ilimsk forest complex


View feedback
Read more

Client: OOO "RK Energostroy"

Work period: September 2018 — December 2018

Project: Scientific and research work on the development of technology and equipment for black oil-free ignition of boiler No.10 at the Troitskaya GRES PAO "OGK-2


Read more

Client: AO "Ilim Group"

Work period: September 2018 — December 2018

Project: Development of a FEL-3 investment request and design documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma


View feedback
Read more

Client: OOO "QUARTZ Group

Work period: September 2018 — December 2018

Project: Creating the basic design and detailed design documentation for blowers’ installation at the pulverized coal 200 MW power unit No.6 of Novosibirskaya CHP-5


View feedback
Read more

Client: PAO TGK-14

Work period: September — November 2018

Project: Development of a design-estimate and detailed design documentation for the re-equipping of Ulan-Ude CHP-2


View feedback
Read more

Client: PAO Irkutskenergo

Work period: September 2018 — November 2018

Project: Design and survey works for the "Re-equipping of the Irkutskaya CHP-10’s boiler plants through the implementation of pulverized coal electroionization ignition technology" project


Read more

Client: OOO "EnergoEngineeringGroup"

Work period: January 2018 — November 2018

Project: Upgrade of the deaeration and make-up plant at CHP-3 in the city of Omsk


View feedback
Read more

Client: AO "Razrez-Izykhskiy"

Work period: September 2018 — October 2018

Project: DKVR and KE boilers performance-and-commissioning tests using coal at the AO "Razrez Izykhskiy" boiler house


View feedback
Read more

Client: PAO "MosEnergo"

Work period: August 2018 — October 2018

Project: Retrofit of power unit No. 9 at CHP-22 Mosenergo


View feedback
Read more

Client: PAO Irkutskenergo

Work period: March 2018 — August 2018

Project: Feasibility study for the installation of automatic systems for continuous monitoring of pollutant emission volume and/or mass and concentration and accounting (APECM&AS) at seven Irkutskenergo plants


Read more

Client: ZAO "Ekran-Energiya"

Work period: June-August 2018

Project: Feasibility study for the construction of an 8 MW mini-TPP


View feedback
Read more

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: March 2018 — July 2018

Project: Arrangement of a cooling system with return water circulation in the Linyovo heat supply boiler house, Novosibirsk Region


Read more

Client: OOO "Voronezh-Akva"

Work period: May 2018 — June 2018

Project: Development of detailed design documentation for water treatment plants and sewage treatment facilities during the construction and putting into commercial operation of power unit No.3 (CCPP-247.5 MW) at the Chelyabinskaya GRES PAO "Fortum"


View feedback
Read more

Client: AO "Ilim Group"

Work period: April 2018 — May 2018

Project: Development of detailed design documentation for the automated individual heating plants and automated temperature control systems in the rooms of factory-adjacent buildings at the Bratsk Pulp and Paper Mill


View feedback
Read more

Client: OOO Vorkutinskiye CHP Plants

Work period: March 2018

Project: Trial burning of furnace black oil 100, STO 05747181-034-2017 at Central water heating boiler house of the city of Vorkuta


View feedback
Read more

Client: AO "Ilim Group"

Work period: August of 2017 — March of 2018

Project: Development of detailed design documentation for equipping the emission sources with automatic information systems (AIS) for continuous monitoring and accounting of pollutant industrial emissions mass at the Ust-Ilimsk Pulp and Paper Mill


View feedback
Read more

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: January 2018 — February 2018

Project: Performance-and-commissioning boilers BKZ-75-39 tests in the Linyovo heat supply boiler house, Novosibirsk Region


View feedback
Read more

Client: PAO "Tyazhstankogidropress"

Work period: June 2017 — January 2018

Project: Development of the basic design and detailed design documentation for the re-equipping of the 20 MW gas boiler house at Tyazhstankogidropress. Equipment supply, installation and commissioning.


View feedback
Read more

2017

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: August 2017 — December 2017

Project: Development of design alternatives for the flue draft fans and district heating pump control system at the Linyovo heat supply boiler house, Novosibirsk Region


Read more

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: August 2017 — December 2017

Project: Examination of technical condition with development of a proposal for improving the efficiency and reliability of the Linyovo heat supply boiler house, Novosibirsk Region


Read more

Client: PAO "TGK-14" Chitinskaya Generatsiya"

Work period: October 2017 – December 2017

Project: Development of a feasibility study for cycle arrangement optimization at the Chitinskaya CHP-1


View feedback
Read more

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: November 2017 — December 2017

Project: Technical examination and retrofit of the igniter assemblies at the Linyovo heat supply boiler house, Novosibirsk Region


Read more

Client: OOO "Tsentralnaya CHP Plant", city of Novokuznetsk

Work period: June 2017 — November 2017

Project: Creating the design and estimate documentation for conversion of the first stage boiler plant to operation at reduced steam parameters


View feedback
Read more

Client: OOO Vorkutinskiye CHP Plants

Work period: May 2017 — October 2017

Project: Trial burning of black coal ("GZhO" type, "SSh" grade)


View feedback
Read more

Client: OOO Tsentralnaya CHP Plant

Work period: June 2017 — October 2017

Project: Creating the design and estimate documentation for the installation of injection steam condensers on boiler plants Nos. 5, 8


Read more

Client: PAO "Tyazhstankogidropress

Work period: July 2017 — August 2017

Project: Development of detailed design documentation for the re-equipping project of the forge and press shop furnaces at the Tyazhstankogidropress plant boiler house, in the city of Novosibirsk


Read more

Client: OOO "StroyTEKS"

Work period: July 2017 — August 2017

Project: Examination and retrofitting of the liquid fuel feeding system at a boiler house in the city of Novosibirsk


Read more

Client: OOO Regional Expert Review Centre

Work period: June 2017 — July 2017

Project: Technical examination of power capacities and elaboration of the retrofit and development program for the Yurginskaya CHP Plant


View feedback
Read more

Client: ZAO "TEP-Holding"

Work period: October 2016 — March 2017

Project: Installation and pre-commissioning in 6 packaged boiler houses of PAO "Tatneft" at the Ersubaykinskoye field


Read more

Client: ТОО "PROJECT "GOLDEN SITY"

Work period: February 2017 — April 2017

Project: Development of a DCS section within the scope of a detailed design of the Water Chemistry Automated Control system at the units Nos 1,2 of Astaninskaya CHP-2


Read more

Client: OAO Ilim Group

Work period: October 2016 — April 2017

Project: Development of detailed design documentation for the boilers’ water chemistry automation, evaluation of the project’s payback


View feedback
Read more

Client: OOO Regional Expert Review Centre

Work period: December 2016 — February 2017

Project: Technical examination of the power capacities of AO SIBECO and AO Biyskenergo, with development of investment programs for the plant’s development


View feedback
Read more

2016

Client: ZAO "TEP-Holding"e

Work period: February 2016 – December 2016

Project: Development of the design and detailed documentation for construction of gas boiler houses for pumping the steam into oil holes for extra-heavy oil production PAO "Tatneft"


Read more






×






×





×
×






×






×

Задайте вопрос!


×






×






×

Задайте вопрос!


×






×






×






×






×






×






×






×






×






×






×






×






×






×






×






×




×




×