Client: ZAO "Ekran-Energiya"
Work period: June-August 2018
Project: Feasibility study for the construction of an 8 MW mini-TPP
View the project descriptionClient: OOO "Siberian Heat and Power Company" (SibTEK)
Work period: January 2018 — February 2018
Project: Performance-and-commissioning boilers BKZ-75-39 tests in the Linyovo heat supply boiler house, Novosibirsk Region
View the project descriptionClient: PAO "Tyazhstankogidropress"
Work period: June 2017 — January 2018
Project: Development of the basic design and detailed design documentation for the re-equipping of the 20 MW gas boiler house at Tyazhstankogidropress. Equipment supply, installation and commissioning.
View the project descriptionPROJECTS
PRESS CENTER
2022 © ООО "COTES Engineering"