Client: AO "Blagoveshchenskaya CHP plant"
Work period: June, 2019 — December, 2019
Project: Stage No.5 boiler unit's emissions monitoring system re-equipment, AO "Blagoveshchenskaya CHP plant"
View the project description Read moreClient: PAO «Irkutskenergo»
Work period: May 2019 — August 2019
Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Angarskaya CHP-10
View the project descriptionClient: PAO «Irkutskenergo»
Work period: May 2019 — August 2019
Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Bratskaya CHP-6
View the project descriptionClient: AO "Ilim Group"
Work period: August of 2017 — March of 2018
Project: Detailed design documentation for equipping the emission sources with automatic information systems (AIS) for continuous monitoring and accounting of pollutant industrial emissions mass at the Ust-Ilimsk Pulp and Paper Mill
View the project descriptionClient: OAO Ilim Group
Work period: October 2016 — April 2017
Project: Development of detailed design documentation for the boilers’ water chemistry automation, evaluation of the project’s payback