Client: AO «Valmet Automation»

Work period: September 2019 — April 2020

Project: Commissioning of the biofuel boiler Hybex ® at AO «Mondi SLPK»

View the project description
Read more

Client: AO "Blagoveshchenskaya CHP plant"

Work period: June, 2019 — December, 2019

Project: Stage No.5 boiler unit's emissions monitoring system re-equipment, AO "Blagoveshchenskaya CHP plant"

View the project description
Read more

2019

Client: AO "ILIM Group"

Work period: August, 2019 — October, 2019

Project: : Replacement of wooden sleepers along the edge of the black oil discharge

View the project description
Read more

Client: PAO «Irkutskenergo»

Work period: May 2019 — August 2019

Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Angarskaya CHP-10

View the project description
Read more

Client: PAO «Irkutskenergo»

Work period: May 2019 — August 2019

Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Bratskaya CHP-6

View the project description
Read more

Client: AO "Ilim Group"

Work period: November 2018 — June 2019

Project: Development of FEL-2 documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma

View the project description
Read more

Client: AO "OTEK"

Work period: January 2019 — May 2019

Project: Elaboration of an engineering solution and development of the investments justification for upgrading CHP of AO "OTEK" Seversk Branch

View the project description
Read more

Client: PAO TGK-14 (Chitinskaya Generatsiya)

Project: Examination of the hydraulic ash-transport system at Chitinskaya CHP-1 (November 2018 — January 2019)

View the project description

Project: Development of a feasibility study for cycle arrangement optimization (October 2017 – December 2017)

View the project description
Read more

2018

Client: OOO "QUARTZ Group

Work period: September 2018 — December 2018

Project: Creating the basic design and detailed design documentation for blowers’ installation at the pulverized coal 200 MW power unit No.6 of Novosibirskaya CHP-5

View the project description
Read more

Client: AO "Ilim Group"

Work period: October 2017 – December 2018

Project: Development of the design and detailed documentation for the re-equipping of recovery boiler RB-1400 No.3 of at the Ust-Ilimsk forest complex

View the project description
Read more

Client: AO "Ilim Group"

Work period: September 2018 — December 2018

Project: Development of a FEL-3 investment request and design documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma

View the project description
Read more

Client: OOO "EnergoEngineeringGroup"

Work period: January 2018 — November 2018

Project: Upgrade of the deaeration and make-up plant at CHP-3 in the city of Omsk

View the project description
Read more

Client: PAO TGK-14

Work period: September — November 2018

Project: Development of a design-estimate and detailed design documentation for the re-equipping of Ulan-Ude CHP-2

View the project description
Read more

Client: PAO "MosEnergo"

Work period: August 2018 — October 2018

Project: Retrofit of power unit No. 9 at CHP-22 Mosenergo

View the project description
Read more

Client: AO "Razrez-Izykhskiy"

Work period: September 2018 — October 2018

Project: DKVR and KE boilers performance-and-commissioning tests using coal at the AO "Razrez Izykhskiy" boiler house

View the project description
Read more

Client: ZAO "Ekran-Energiya"

Work period: June-August 2018

Project: Feasibility study for the construction of an 8 MW mini-TPP

View the project description
Read more

Client: OOO "Voronezh-Akva"

Work period: May 2018 — June 2018

Project: Detailed design documentation for water treatment plants and sewage treatment facilities for the construction of power unit No.3 (CCPP-247.5 MW) at the Chelyabinskaya GRES PAO "Fortum"

View the project description
Read more

Client: AO "Ilim Group"

Work period: April 2018 — May 2018

Project: Development of detailed design documentation for the automated individual heating plants and automated temperature control systems in the rooms of factory-adjacent buildings at the Bratsk Pulp and Paper Mill

View the project description
Read more

Client: OOO Vorkutinskiye CHP Plants

Work period: March 2018

Project: Trial burning of furnace black oil 100, STO 05747181-034-2017 at Central water heating boiler house of the city of VorkutaFee

View the project description
Read more

Client: AO "Ilim Group"

Work period: August of 2017 — March of 2018

Project: Detailed design documentation for equipping the emission sources with automatic information systems (AIS) for continuous monitoring and accounting of pollutant industrial emissions mass at the Ust-Ilimsk Pulp and Paper Mill

View the project description
Read more

Client: OOO "Siberian Heat and Power Company" (SibTEK)

Work period: January 2018 — February 2018

Project: Performance-and-commissioning boilers BKZ-75-39 tests in the Linyovo heat supply boiler house, Novosibirsk Region

View the project description
Read more

Client: PAO "Tyazhstankogidropress"

Work period: June 2017 — January 2018

Project: Development of the basic design and detailed design documentation for the re-equipping of the 20 MW gas boiler house at Tyazhstankogidropress. Equipment supply, installation and commissioning.

View the project description
Read more

2017

Client: OOO "Tsentralnaya CHP Plant", city of Novokuznetsk

Work period: June 2017 — November 2017

Project: Creating the design and estimate documentation for conversion of the first stage boiler plant to operation at reduced steam parameters

View the project description
Read more

Client: OOO Regional Expert Review Centre

Work period: June 2017 — July 2017

Project: Technical examination of power capacities and elaboration of the retrofit and development program for the Yurginskaya CHP

View the project description
Read more

Client: OOO Vorkutinskiye CHP Plants

Work period: May 2017 — October 2017

Project: Trial burning of black coal ("GZhO" type, "SSh" grade)

View the project description
Read more

Client: OAO Ilim Group

Work period: October 2016 — April 2017

Project: Development of detailed design documentation for the boilers’ water chemistry automation, evaluation of the project’s payback

View the project description
Read more

Client: OOO Regional Expert Review Centre

Work period: December 2016 — February 2017

Project: Technical examination of the power capacities of AO SIBECO and AO Biyskenergo, with development of investment programs for the plant’s development

View the project description
Read more






×






×





×
×






×






×